...

WELL STIMULATION SUPPORT SERVICES

+966 13 845 4400 Custom_Number

Specifications

Providing comprehensive acid mixing services which come as a cornerstone for our ultimate goal of becoming a reliable local partner to upstream service providers bringing value to their core operations. Our current services include the hauling, storage and complete mixing services for well stimulation. We utilize technologies to optimize the time and cost of our operations.

On average, our rig up time, for example, is 60% faster than anyone else’s as our equipment is designed for fast and rapid deployment and de-mobilization.

Frac Tank

Capacity:          500 bbls
Coating:            FRP
Discharge:       8” manifold with 2 x 8” blind flanges and 2 x 4” 206   hammer unions (front)
Inlet:                  2 x 4” 206 Hammer Union connections (front)
Drain:                4” 206 Hammer Union connection (front)
Manholes:        1 Top Manhole + 1 Side Manhole
Manholes:        3” 206 Hammer union connection (back)

City

Found Date

License Number

Product Name: WELL STIMULATION SUPPORT SERVICES